How long does a remodel with Lamont Bros. take?

Most Lamont Bros. projects start with a couple of months of design, followed by construction that ranges from about a month for a smaller bathroom to several months for a whole-home remodel.

During design, Lamont's team meets with you, visits your home, presents concepts, and works through selections. Lamont Bros. plans the whole project before construction begins, so whole-home remodels, additions, and projects with structural engineering take longer in planning.

Construction time depends on complexity. A kitchen typically takes about 8 to 12 weeks to build. Projects that add structural work, a bathroom, or new flooring take longer. Your design consultant will give you a realistic timeline for your specific project.