The wood floors, built-ins, and proportions of an older home can make it a hard place to leave. But after years of living with a closed-off kitchen, drafty rooms, or bathrooms that no longer serve your family, you may be ready for the house to work differently.
An old house renovation starts with the home you can see and the systems you cannot. Before settling on finishes or removing walls, have your team evaluate the structure, electrical and plumbing systems, moisture, and materials that could be disturbed during construction. The findings help shape the design, budget, and order of work.
Not every older house needs the same repairs. One home may have updated wiring and a sound foundation; another may need significant work behind the walls before the visible renovation can begin. The goal is to make those decisions early, preserve the features you value, and leave room in the budget for conditions that cannot be confirmed until construction starts.
Key Points
-
Start with the home’s condition as well as your design goals. Water intrusion, structural concerns, and unsafe systems can affect the rest of the project.
-
Older wiring, lead-based paint, and asbestos-containing materials need appropriate evaluation before renovation work disturbs them.
-
Foundation, insulation, heating, and ventilation decisions should be planned together with the new layout.
-
A contingency gives you a way to pay for discoveries that were not visible or included in the original scope.
-
A whole-home plan can coordinate necessary repairs with the rooms and finishes you want to improve.
What Should You Expect When Renovating an Old House?
Expect the planning process to involve some investigation before design decisions are final.
An older Portland home may have been renovated several times, with each owner changing part of the house. A kitchen wall may contain an old chimney, a basement may have a previous repair hidden behind finishes, or a newer electrical panel may serve a mix of old and new wiring.
Some of those conditions can be identified during visits and inspections. Others become visible only after walls, floors, or ceilings are opened. That does not mean the project cannot be planned; it means the plan should distinguish what is known from what still needs investigation.
For example, during a kitchen renovation in a 1921 Parkrose home, the Lamont Bros. team found a hidden chimney and an unexpected load-bearing condition. Additional engineering and demolition allowed the planned kitchen opening to move forward. That was one project’s solution, but it shows why the team needs a process for evaluating discoveries.

If you are considering changes in several rooms, start by planning the whole-home remodel as one connected project. The decisions you make about structure, circulation, utilities, and finishes can affect spaces well beyond the first room you want to change.
What Should You Fix First in an Older Home?
Begin with conditions that affect safety, prevent further damage, or determine what can be built. A leaking roof or ongoing water intrusion deserves attention before new finishes are installed over damaged materials. Structural concerns and electrical hazards should also be evaluated before the design assumes a wall can be removed or a space can be enclosed.

That does not mean every repair must be completed before design starts. The assessment and design often inform each other. If you want to open the kitchen to the dining room, for example, the team needs to know how the wall is supported before settling on the layout. If you want to finish a damp basement, moisture and drainage need to be part of the plan.
A practical order for the work is to investigate the house, resolve immediate hazards and sources of damage, design the structural and system changes, and then complete insulation and finishes after the work behind them is ready. Your team should establish the sequence for your home rather than apply a fixed checklist to every project.
What Might Be Hiding Behind the Walls?
Some discoveries affect the scope because they change how the house is supported or how its systems run. Others affect the order of work or require a specialist before demolition can continue.
Knob-and-Tube Wiring and Electrical Capacity
An older electrical system may include a mix of original wiring and later additions. A renovated room or newer panel does not necessarily mean every circuit in the house has been updated.
Knob-and-tube wiring is one system a licensed electrician may encounter. Its condition, any modifications, and the surrounding insulation matter when deciding what work is appropriate. Before adding insulation or closing renovated walls, have the electrician evaluate the circuits in the affected areas and plan the electrical work around the new layout.
The electrical plan should also account for how you intend to use the home. A redesigned kitchen, heat pump, electric range, or future vehicle charger can change the demands on the system. Learn more about how knob-and-tube wiring affects a remodel.
Lead-Based Paint
A home built before 1978 may contain lead-based paint, including beneath newer layers. Sanding, cutting, window replacement, or demolition can create lead-contaminated dust when painted surfaces are disturbed.

Before work begins, ask your contractor how affected surfaces will be assessed and how the work area will be contained and cleaned. For covered renovation work in pre-1978 housing, lead-safe certification and work practices apply; Oregon administers its own authorized program. Testing and requirements depend on the work and circumstances, so confirm the plan with qualified professionals.
The point is not that every old painted surface must be stripped. It is to identify the work that will disturb painted materials and plan for it before construction begins.
Asbestos-Containing Materials
Asbestos can be present in a range of older building materials, including some flooring, insulation, and textured products. You cannot determine that a material contains asbestos just by looking at it.

In Oregon, residential buildings constructed before January 1, 2004 generally require an asbestos survey by an accredited inspector before renovation or demolition. There are exceptions, including certain renovations performed by an owner-occupant in their own single-family home, and the rules differ for demolition. Your contractor should confirm the requirements for your project before materials are disturbed.
If asbestos-containing material is identified, the appropriate response depends on the material and planned work. Ask who will handle any required abatement, how it is included in the schedule, and how the area will be prepared for the next phase.
Foundation and Structural Conditions
A sloping floor or a crack may raise questions, but its cause and significance need professional evaluation. The age of a foundation alone does not tell you which repairs are necessary.
A structural review can help the team assess the foundation, framing, beams, and the loads involved in your proposed changes. This becomes especially important when you want to remove walls, alter stairs, add living space, or change the load on the house.

Foundation and structural work can influence room layouts, ceiling heights, and the construction budget. Investigating those questions during design gives you a better basis for deciding which changes to pursue.
A larger renovation can also be a time to ask a qualified professional about seismic improvements for an older Portland home. The appropriate approach depends on the house and its existing structure.
Plumbing, Moisture, and Previous Repairs
Old supply lines, drains, past leaks, and concealed water damage can affect a whole-home plan. A bathroom may look ready for new tile while the framing or plumbing behind it needs attention first.
Look for the source of moisture, not just its visible effects. Depending on the home, that may involve the roof, exterior drainage, plumbing, ventilation, or water entering below grade. Your team can then decide which repairs belong in the project and which specialists should evaluate them.

It is also worth reviewing prior work and permit records. Earlier changes may have been well documented, but records can be incomplete. If your team finds work without the expected approvals, ask how that affects the proposed renovation before covering it up again. Our guide to addressing work that was completed without a building permit explains some of the decisions involved.
Can You Insulate an Older House During a Renovation?
Often, yes. A renovation can create access to walls, ceilings, or floors that would otherwise remain closed. But insulation should be planned alongside electrical work, moisture control, air sealing, and ventilation.
For example, active knob-and-tube wiring requires attention before insulation is installed around it. A damp basement also needs a moisture plan before new materials conceal the area. Your contractor and relevant trades can evaluate the assembly and recommend an approach for the conditions they find.
The aim is a more comfortable home without creating a new problem behind the finish. If you are changing heating equipment or opening several rooms at once, discuss those decisions together rather than treating insulation as an isolated upgrade.
How Do You Preserve an Older Home’s Character?
Start by identifying the details that make the house feel like yours. That may be original woodwork, a staircase, built-in cabinetry, flooring, windows, or the way rooms connect.
Some features can be repaired and retained. Others may need to be adapted to accommodate structural work, new systems, or a layout that better serves your family. Knowing your priorities gives the design team a direction when it has to make those tradeoffs.
In this 1923 Concordia home, Lamont Bros. combined structural support for a redesigned staircase with a plan that respected the house’s historic character. In another project, a 1950s Southwest Portland home gained a more connected main floor and a revised basement stair location.

Preservation can also call for repairs that blend into the original craftsmanship. During the restoration of a Portland Heights landmark, the team worked to repair distinctive materials while maintaining continuity with the existing home.
If your property has historic designation or is in a protected district, ask your team to check any applicable review requirements before committing to exterior changes or other work.
How Should You Plan a Renovation Contingency?
A contingency is money set aside for project costs that cannot be fully defined when the original scope is priced. In an older home, that might include concealed damage, a structural condition found during demolition, or additional work required after a specialist evaluates an exposed area.
Start by asking your contractor what is already included in the proposal. A known repair should be addressed in the scope and price, not treated as an unexpected discovery. Then discuss the areas that cannot be inspected without opening the house and the kinds of findings that could change the work.
Set the reserve with your team based on those risks, the extent of the renovation, and your comfort with uncertainty. There is no single percentage that fits every home. Keep the contingency separate from the amount needed for your planned selections, and discuss how a change will be priced and approved before additional work proceeds.
Our guide to estimating remodeling costs walks through the budget decisions that come before construction. If you are borrowing for the renovation, include the reserve in conversations with your lender as well.
Should You Renovate an Older House All at Once?
A whole-home renovation can be a good fit when several rooms, structural changes, and system upgrades need to work together. Planning them as one project lets the team consider how a new kitchen layout affects the adjacent living space, how plumbing serves multiple bathrooms, and how electrical and insulation work fit into the areas being opened.

A phased approach may be appropriate for some homeowners. Before dividing the project, ask your team how the phases connect. Work completed now should not unnecessarily block a future layout or require finished surfaces to be opened again.
A full renovation may also affect where you live during construction. Discuss dust containment, access to kitchens and bathrooms, work hours, and the extent of the disruption before deciding to remain in the house. You can also explore how Lamont Bros. approaches whole-home remodeling in Portland when several parts of the home need to change together.
As you plan around family events or a possible move-out period, take a closer look at the stages and timing of a whole-house remodel.
Frequently Asked Questions
Is It Worth Renovating an Old House?
It can be, especially if you value the location and character of the home but want it to better suit your life. The decision depends on the home’s condition, your goals, the likely scope, and the investment you are comfortable making. A property assessment and early budget discussion can help you compare renovation with other options.
Should I Test for Lead and Asbestos Before Remodeling?
Discuss both with your contractor before disturbing older materials. The appropriate testing, survey, and work practices depend on the home, the planned work, and the applicable rules. In Oregon, an accredited asbestos survey is generally required before renovating a residential building constructed before 2004, with specific exceptions.
Can I Remove Walls in an Older House?
Possibly. Before removing a wall, have the team determine what it supports and what runs through it. A structural engineer may be needed to design the support for the proposed opening. Electrical, plumbing, or heating systems inside the wall may also need to be relocated.
Can I Live in My House During a Whole-Home Renovation?
That depends on the scope, the rooms affected, and the contractor’s plan for separating the work area. Ask about access to cooking, bathing, sleeping areas, and utilities throughout construction. For some projects, arranging another place to stay may be more practical.
Plan a Renovation That Respects Your Home
You do not have to choose between the character that drew you to your home and the changes your family needs. A good plan starts by looking closely at both: the details worth preserving and the work required to make the house function better. Learn more about our whole home remodeling services.
If you are considering a whole-home renovation in the Portland area, Lamont Bros. can discuss your goals, assess the scope you have in mind, and help you plan the next steps. Bring the questions you have about the house, the rooms that no longer work, and the features you want to keep.
You can also see how our design-build process brings planning and construction together before you reach out.
Co-Founder & CEO of Lamont Bros. Design & Construction
Joseph Patrick is the co-founder and CEO of Lamont Bros. Design & Construction. As Lamont Bros.’ principal designer for many years, he has led the design of custom homes, major additions, and high-end remodels throughout the Portland area, with multiple awards, design accolades, and magazine mentions.